A mission-critical data center in Romford
Green Mountain’s Romford Campus, also known as LON-East, called for a flooring package built to meet demanding operational, loading and static control requirements. Loughton Contracts was appointed to deliver the full scope, bringing together screed, specialist resin flooring and raised access flooring.
Performance began at subfloor level, with sand and cement screed and comprehensive floor preparation works carried out throughout the facility ahead of the specialist finishes above.
Built for precision and safety
Across the battery and switch rooms, specialist electrostatic dissipative (ESD) resin flooring was installed to dissipate static safely and protect sensitive equipment, while a heavy-duty anti-slip resin system was fitted in the chiller plant room for enhanced durability. Raised access flooring, complete with specialist stair interfaces, was installed throughout, alongside a bespoke six-tonne steel access ramp, designed and fabricated to accommodate heavy equipment movement within the facility.